Product name:
Used crawler best used two component road marking machines
Two component road marking machine is an advanced marking method. Two components marking paint consists of cold plastic paint and curing agent. The two liquids are contained in separate tanks until they are sprayed and confluence in the air during marking operation. After cold plastic paint and curing agent are mixed in the air, they immediately form the marking lines on the road because the curing agent helps speed up the solidification of paint. The marking width can be controlled by adjusting the angle of sprayers.
Advantages of two component road marking machine
Road Marking Machine,Thermoplastic Road Marking Machine,Hand-push Thermoplastic Road Marking Machine,Hand-pushed Cold Paint and Cold Plastic Road Marking Machine,Two-component Cold Plastic Road Marking Machine for Screeding Marking ,Self-propelled Two-component Cold Plastic Road Marking Machine for Structure Marking
Basic information:
Two component road marking machine is an advanced marking method. Two components marking paint consists of cold plastic paint and curing agent. The two liquids are contained in separate tanks until they are sprayed and confluence in the air during marking operation. After cold plastic paint and curing agent are mixed in the air, they immediately form the marking lines on the road because the curing agent helps speed up the solidification of paint. The marking width can be controlled by adjusting the angle of sprayers.
Product detail
the thermoplastic road marking needs 7 people and 8 hours for a 600 square meter road marking work. However, two component road marking only need 4 people and 4 hours for the same work.
Two component road marking equipment is different from thermoplastic and cold plastic road marking. It forms coating relying on chemical reaction instead of physical drying such as temperature falling or solvent (water-based) volatilizing.
Brief introduction
It is the most widely used two-component road marking machine. By changing the marking shoe, it is easy to realize construction of various two-component line types such as structural line, the flat line, rib lines with bottom line or without bottom line.
Main Parts and Characteristics
1, Marking Line Container
2, Moving Board
3, Glass Beads Dropping
4, Wheels
5, Glass Beads Container
6, Ignitions
7, Coating Container
8, Pilot
9, Glass Beads Controller
10, Wheels Fixer
Description:
Its advantages are its good adhesion, good anti-slip performance, fast drying, and so on. It is especially suitable for the rainy day and provides road users with a good visual identification effect and good anti-slip performance. It prevents road users from slippery accidents and is suitable for different road sections such as driveways, downhill sections, sharp curve areas, parking lots, pedestrian paths, bicycle lanes, general roads, and highways. With the good performance, it not only ensures the safety of the road users, but it also helps beautify the landscape of the city.
Technical File:
Junda Two component road marking machine |
Item |
Parameter |
Model |
JD Two Component |
Engine |
Honda petrol engine, OHV4 stroke air-cooled power 5.5 HP |
Driving mode of walking |
Automatic hydraulic stepless variable speed |
Running speed |
10-15m/min |
Maximum gradability |
15° |
Thickness of the line |
Flat line: 0-3.5mm, block: height 6.5mm (adjustable 0-10mm) |
Bump length |
Arbitrary length is controlled by CPU intelligence programs |
Hopper |
Capacity of 60 kg * 2 |
Double glass bead area |
Manual sync capacity of 25 kg * 2 clutch aeroplanes |
Rubber wheel |
Iron wheels, special heat-resistant rubber, trailing wheel is equipped with the locator, make the body along a straight line |
line width |
Optional 150/200/300/400/450 mm (customizable) |
Size |
1300 * 1000 * 1170 mm wide (does not contain a pointer) |
Net weight |
296kg |
Dosage of glass beads |
500-600g/m |
Paint dosage |
2-3kg/m² |
Picture |
|
Application:
Ensure surfaces are clean, dry and free from any loose material. Remove any contamination, including dust, oil and laitance.
The drying occurs by the chemical reaction that is generated by mixing the powder B component with the liquid A component. Thus,
the paint must be applied within maximum of seven minutes after mixing the B component. Glass beads can be poured on to increase its reflective effect. Do not apply in summer daytime and hot air.
Application scenarios include city road, Highway, Mountain road, Parking, Court and other places
Certification
Packing & Delivery:
Installation and Warranty:
1. Installation and commissioning issue:
We will send 1-2 technicians to assist with machine installation and commissioning, customer pays for their tickets, hotel and meals, etc Customer needs to arrange 3-4 skilled workers and prepare installation machinery and tools.
2. Warranty time:
12 months from date of commissioning completion, but no more than 18 months from date of delivery.
3. Supply full English documents:
including foundation drawings, operating manual, electric wiring diagram, electric manual and maintenance manual, etc.
Company Profie:
Jinan Junda Industrial Technology is a professional enterprise which engages in researching,manufacturing and selling a full set of road line marking equipment.
Our enterprise aims to provide the best quality, most scientific and most efficient road facilities to our clients all over the world.
Our company maintains the concept of innovation, excellent quality and perfect service. We have been devoting ourselves to making a big contribution to the field of transportation infrastructure construction.
Our company's mission is to be number one in our industry, with the core value of fighting against the impossible,and holding the enterprise's spirit that is to regard honesty and trustworthiness as the core,to win by quality, and finally to become most valuable enterprise in the world.
FAQ
- Can I get some samples?
Yes, sample orders are available for quality inspection and market testing. Samples can be provided, and the freight needs to be paid by you.
2. What is the delivery time?
It usually takes 3-5 business days for small orders and 7 days for large orders.
3. What are your payment terms?
We generally accept various payment methods. Such as T/T, L/C, Western Union. cash.
4. What are your warranty terms?
We offer 18 months warranty.
5. Do you have any products in stock?
Depending on your requirements, we have standard models in stock. Some special products and large orders will be newly produced according to your order.
6. Can your product be customized according to my standard?
It can be customized, and you need to send customization details request to calculate the unit price!
7. How does your factory conduct quality control?
Quality comes first, and we always attach importance to quality control from the start of production to the end. Each product is fully assembled and carefully tested before being packaged and shipped.
Contact us: