Product name:
Two Component Road Marking Machine
Two-component pavement marking is used for marking project that need to be quickly applied such as car parks, road crossing and edge lines. The paint can be curing within 5-30 minutes depending on application method.
Two component road marking machine is equipped with two high pressure diaphragm pumps: one for cold plastic paint and another for curing agent. Changing the angle of the two pumps will adjust the intersection point of paint and curing agent. While mixed, the curing agent will accelerate the forming speed of polymer methyl methacrylate pavement markings.
Advantages of two component road marking machine
Two component marking system has many advantages compare to thermoplastic and cold solvent marking:
1. Quick application . Rapid curing for less road blocking.
2. Exceptional adhesion to a variety of road substrates such as concrete and asphalt surfaces.
3. High retro-reflective. Glass beads and paint are tightly mixed.
4. Excellent weather resistance. Keep excellent performance in all temperature and weather.
5. Great wear and stain resistance. Long service life in poor conditions.
6. Environment friendly. Without solvent, the paint has little damage to environment.
Despite so many advantages, the cost of two component road marking is considered very expensive compared to other marking methods. Curing agent and special designed machines significantly increase the cost of road marking project. The structure of two component marking equipment is very complex, which leads to high maintenance cost. These all limit the application of this advanced marking method.
Features:
Two component road marking machine is equipped with two high pressure diaphragm pumps: one for cold plastic paint and another for curing agent. Changing the angle of two pumps will adjust the intersection point of paint and curing agent. While mixed, the curing agent will accelerate the forming speed of polymer methyl methacrylate pavement markings.
Basic information:
Two components marking have excellent performance on asphalt surfaces and are very resistant to snow plowing. Due to this reason, two component marking system is widely used in cold weather areas such as northern Europe.
The two components paint consists of cold plastic paint and curing agent. When marking, the two components are mixed immediately before application to form the pavement marking. The service life of two component pavement marking normally ranges between 2 and 4 years based on traffic volumes.
Main Parts and Characteristics
Equipped the two component marking machine uses high pressure diaphragm pump as its spray pump. The air pump and two high pressure diaphragm pumps are driven by gasoline engine through belt driving. Compared with high pressure plunger pump, the high pressure diaphragm pump has advantages of simple structure, convenient maintenance and high pumping frequency.
Hydraulic pumps: There are two pumps: one for two component paint and the other for curing agent.
Spray guns: There are two spray guns, with one spraying cold plastic paint and the other curing agent. The height and distance of spray guns can be adjusted to mark lines in different width and spacing
∧ Suitable for both 98:2 and 1:1 application.
∧ Precise speed control and adjustment
∧ Convenient to control mixing ratio of paint and hardener
∧ Easy to achieve a variety of applications through changing different marking device.
∧ Glass beads dispenser, synchronize with the marking system.
∧ Integrated control panel enhances automation.
∧ Special surface coating, very durable.
Description:
Two component pavement marking paint is considered very expensive compared to other materials. In addition, special equipment is needed for applying two component pavement markings.
Technical File:
Junda Two component road marking machine |
Item |
Parameter |
Model |
JD Two Component |
Engine |
Honda petrol engine, OHV4 stroke air-cooled power 5.5 HP |
Driving mode of walking |
Automatic hydraulic stepless variable speed |
Running speed |
10-15m/min |
Maximum gradability |
15° |
Thickness of the line |
Flat line: 0-3.5mm, block: height 6.5mm (adjustable 0-10mm) |
Bump length |
Arbitrary length is controlled by CPU intelligence programs |
Hopper |
Capacity of 60 kg * 2 |
Double glass bead area |
Manual sync capacity of 25 kg * 2 clutch aeroplanes |
Rubber wheel |
Iron wheels, special heat-resistant rubber, trailing wheel is equipped with the locator, make the body along a straight line |
line width |
Optional 150/200/300/400/450 mm (customizable) |
Size |
1300 * 1000 * 1170 mm wide (does not contain a pointer) |
Net weight |
296kg |
Dosage of glass beads |
500-600g/m |
Paint dosage |
2-3kg/m² |
Application:
Two component marking system has many advantages compare to thermoplastic and cold solvent marking: good flexibility, excellent adhesion and wear resistance, great weather resistance, nice light resistance, prominent Self-cleaning and environment friendly.
However, the cost of two component road marking is considered very expensive compared to other materials.
Certification
Packing & Delivery:
Installation and Warranty:
1. Installation and commissioning issue:
We will send 1-2 technicians to assist with machine installation and commissioning, customer pays for their tickets, hotel and meals, etc Customer needs to arrange 3-4 skilled workers and prepare installation machinery and tools.
2. Warranty time:
12 months from date of commissioning completion, but no more than 18 months from date of delivery.
3. Supply full English documents:
including foundation drawings, operating manual, electric wiring diagram, electric manual and maintenance manual, etc.
Company Profie:
Jinan Junda Industrial Technology is a professional enterprise which engages in researching,manufacturing and selling a full set of road line marking equipment.
Our enterprise aims to provide the best quality, most scientific and most efficient road facilities to our clients all over the world.
Our company maintains the concept of innovation, excellent quality and perfect service. We have been devoting ourselves to making a big contribution to the field of transportation infrastructure construction.
Our company's mission is to be number one in our industry, with the core value of fighting against the impossible,and holding the enterprise's spirit that is to regard honesty and trustworthiness as the core,to win by quality, and finally to become most valuable enterprise in the world.
FAQ
- Can I get some samples?
Yes, sample orders are available for quality inspection and market testing. Samples can be provided, and the freight needs to be paid by you.
2. What is the delivery time?
It usually takes 3-5 business days for small orders and 7 days for large orders.
3. What are your payment terms?
We generally accept various payment methods. Such as T/T, L/C, Western Union. cash.
4. What are your warranty terms?
We offer 18 months warranty.
5. Do you have any products in stock?
Depending on your requirements, we have standard models in stock. Some special products and large orders will be newly produced according to your order.
6. Can your product be customized according to my standard?
It can be customized, and you need to send customization details request to calculate the unit price!
7. How does your factory conduct quality control?
Quality comes first, and we always attach importance to quality control from the start of production to the end. Each product is fully assembled and carefully tested before being packaged and shipped.
Contact us: